STEP 01
  • Prepare the drawings and building regulations for approval by the client. Provide the clients with a project start date.
  • Erect secure scaffolding around the house.
  • Remove hip and rear sloping roof in readiness for Gable and Rear Dormer.
  • Install new steel R.S.J Beams to support Rear Dormer and new floor in loft.
  • Build rear and gable dormers or gable wall and waterproof dormer roof.
STEP 02
  • Roofing works to dormer and brickwork to gable.
  • Fix new floor joists into previous fix R.S.J Steels, 1st fix plumbing and electrics into new floor.
  • Install new staircase.
  • Insulate floors, walls and dormer roof.
  • Fix new UPVC windows in loft bedroom and en-suite.
STEP 03
  • Remove scaffolding from around the house.
  • Plasterboard loft area and prepare for plastering works. Plaster skimming to all walls and ceilings.
STEP 04
  • Tile en-suite floor and walls.
  • 2nd fix electrical and plumbing.
  • All joinery works including skirting, architraves, doors, cupboards, wardrobes, and staircase work handrails and spindles.
STEP 05
  • Building inspector to issue completion certificates for the building works and electrical.
  • Leave job clean and tidy, hand over work ready for carpet and decorations.
  • On time, on budget and to the complete satisfaction of the client.