- Prepare the drawings and building regulations for approval by the client. Provide the clients with a project start date.
- Erect secure scaffolding around the house.
- Remove hip and rear sloping roof in readiness for Gable and Rear Dormer.
- Install new steel R.S.J Beams to support Rear Dormer and new floor in loft.
- Build rear and gable dormers or gable wall and waterproof dormer roof.
How It Works
STEP
01
STEP
02
- Roofing works to dormer and brickwork to gable.
- Fix new floor joists into previous fix R.S.J Steels, 1st fix plumbing and electrics into new floor.
- Install new staircase.
- Insulate floors, walls and dormer roof.
- Fix new UPVC windows in loft bedroom and en-suite.
STEP
03
- Remove scaffolding from around the house.
- Plasterboard loft area and prepare for plastering works. Plaster skimming to all walls and ceilings.
STEP
04
- Tile en-suite floor and walls.
- 2nd fix electrical and plumbing.
- All joinery works including skirting, architraves, doors, cupboards, wardrobes, and staircase work handrails and spindles.
STEP
05
- Building inspector to issue completion certificates for the building works and electrical.
- Leave job clean and tidy, hand over work ready for carpet and decorations.
- On time, on budget and to the complete satisfaction of the client.